![[texts]](/images/mediatype_texts.gif) | Marcus Eli Ravage - Commissary to the Gentiles Marcus Eli Ravage - Commissary to the Gentiles Keywords: Marcus Eli Ravage - Commissary to the Gentiles; Marcus Eli Ravage; Marcus; Eli; Ravage; Commissary to the Gentiles; gentile; gentiles; commissary Downloads: 42 |  |
![[movies]](/images/mediatype_movies.gif) | NYCGA Minutes 2/7/2012 - Lauren Devereaux This meeting is broken up into four audio files. 1. Start of the meeting until the batteries die (Working group reportbacks, start of the proposal to form the Anarchist caucus) 2. Batteries replaced, conclusion of the first proposal, proposal from Kitchen for permission to file for a permit for an event in central park, start of the proposal to provide legal aid and commissary. GA moves to Zuccotti 3... Keywords: OWS; NYCGA; Minutes; Anarchist; Bail; Commissary; Kitchen Downloads: 33 |  |
![[texts]](/images/mediatype_texts.gif) | The University of Montana : limited scope audit of operations and controls of the University Center Commissary, fiscal year 1988 (Volume 1988) - Lundberg, Joe W "Letter of transmittal, November 23, 1988"--1st prelim. leaf Keywords: University of Montana--Missoula. University Center Commissary Downloads: 24 |  |
![[texts]](/images/mediatype_texts.gif) | Annual report of Jared I. Whitaker, Commissary General of Georgia : for the fiscal year, ending October 15th, 1863 - Georgia. Commissary General Signed: Jared I. Whitaker Keywords: Georgia. Commissary General; Confederate States of America. Army Downloads: 60 |  |
![[texts]](/images/mediatype_texts.gif) | Marcus Eli Ravage - A Real Case Against The Jews Marcus Eli Ravage - A Real Case Against The Jews Keywords: Marcus Eli Ravage - Commissary to the Gentiles; Marcus Eli Ravage; Marcus; Eli; Ravage; Commissary to the Gentiles; gentile; gentiles; commissary; A Real Case Against the Jews; Jew; Jewish; A Real; Case Against; The Jews Downloads: 44 |  |
![[texts]](/images/mediatype_texts.gif) | Phase 1 Corrective Action Plan Work Plan Commissary/PX Study Area, The Presidio of San Francisco, San Francisco, California - Geomatrix Consultants, Inc. The Phase 1 Correction Action Plan Work Plan for the Phase 1 Area in the Commissay/Post Exchange Study Area at the Presidio of San Francisco documents plans for implementation of the corrective action recommended in the Revised Final Corrective Action Plan for the Commissary/Post Exchange Study Area. The objective of the corrective action within the Phase 1 Area is to address petroleum-affected soil that potentially poses a threat to Crissy Field Marsh and land uses within Area A. Keywords: environmental remediation; Commissary and Main Post Exchange; Commissary/Post Exchange; Former Motor Pool; Building 610; Crissy Field; Presidio Consolidated Motor Pool; soil contamination; groundwater contamination; petroleum contamination; hazardous materials; work plan; soil excavation; soil removal Downloads: 156 |  |
![[texts]](/images/mediatype_texts.gif) | Specifications Phase 1 Corrective Action Plan Implementation Commissary/PX Area Presidio of San Francisco - Geomatrix Consultants, Inc. Project is to remove soil impacted with petroleum, metals, and polyaromatic hydrocarbons from five areas of the site. The site is located in the northern portion of the Presidio. Historic operation at the site included storage of supplies, equipment, and fuels to serve and maintain U.S. Army vehicles. Keywords: environmental remediation; Commissary and Main Post Exchange; Commissary/Post Exchange; Former Motor Pool; Building 610; Crissy Field; Presidio Consolidated Motor Pool; soil contamination; groundwater contamination; petroleum contamination; hazardous materials; soil excavation; soil removal; corrective action plan implementation Downloads: 76 |  |
![[texts]](/images/mediatype_texts.gif) | Final Corrective Action Plan Commissary/PX Study Area, Presidio of San Francisco, California - Treadwell & Rollo, Inc. This corrective action plan encompasses the vicinity of the current Commissary and Main Post Exchange (Commissary/PX) also know as the Former Motor Pool. It has been prepared to evaluate potential remedial alternatives to address adverse effects of the release of petroleum-related contamination and to select corrective action for implementation at the Commissary/PX Study Area. Keywords: environmental remediation; Commissary and Main Post Exchange; Commissary/Post Exchange; Former Motor Pool; Building 610; Crissy Field; Presidio Consolidated Motor Pool; soil contamination; groundwater contamination; petroleum contamination; hazardous materials; corrective action plan Downloads: 726 |  |
![[texts]](/images/mediatype_texts.gif) | Draft Corrective Action Plan Commissary/PX Study Area Presidio of San Francisco, California - Treadwell & Rollo, Inc. This draft corrective action plan encompassess the vicinity of the current Commissary and Main Post Exchange (Commissary/PX) also known as the Former Motor Pool. It has been prepared to evaluated potential remedial alternatives to address adverse effects of the release of petroleum-related contamination and to select corrective action for implementation. Keywords: environmental remediation; Commissary and Main Post Exchange; Commissary/Post Exchange; Former Motor Pool; Building 610; Crissy Field; Presidio Consolidated Motor Pool; soil contamination; groundwater contamination; petroleum contamination; hazardous materials; corrective action plan Downloads: 126 |  |
|
|